Wednesday, February 27, 2013

Day 4 #kitchenrenovation

Yesterday, the pantry was demoed as seen in the picture below.  The black and white tiled floors, the cabinets and and the counter were removed.  We're going to try and craig's list the cabinets, oven and microwave/vent and refrigerator.  If you know of anyone who is interested inany of these things, please let me know.





Here's a good shot of the new pantry doorway.


This is the water shut off and valves for the old washer/dryer.  Mike will likely cap these pipes and drywall over them.  This is will be a big open wall...not sure how we'll fill it up...art work?  hang things like broom, etc?  Hang our pots here?  Leave blank?  Ahhh the possibilities!



Another interesting thing Mike discovered during the demo was the live electrical wires that were just hanging out behind our walls...kinda scary that things like this were lurking behind walls while we were none the wiser. It makes me very grateful we have someone like Mike who is making sure things are done correctly. The live wire that was just duck taped is the green wire directly to the left of the window with the black tape on the end.  There were a couple others just like this throughout the kitchen.

The old/new closet is really starting to take shape.  I love how tall it is.  It would be cool if we use that box on the top of the closet as an open shelf with a basket in it....hmmmm I wonder if that's possible......my wheels are turning...and Jim is shuddering....

 Until tomorrow!

No comments:

Post a Comment